Beta · built from public sources · records marked draft are not yet independently verified · How we grade evidence
// 05 — Infrastructure

Infra­structure

Operational and upcoming AI compute facilities across the UK and EU — campuses, GPU clusters and national supercomputers — with status, power and GPU counts exactly as disclosed.

23 facilities9 countriesPlacement: city-level unless stated
// All facilities

The same data as a table. Click a column to sort.

FacilityStatusLocationPower (as published) GPUs (as stated)Expected onlineEvidence
Industrial AI Cloud (Tucherpark)
Deutsche Telekom
operationalMunich
Germany
Not disclosedNot disclosed—B draft · Source →Map ↗
JUPITER
Forschungszentrum Jülich
operationalJülich
Germany
Not disclosed24,000 GH200—B draft · Source →Map ↗
Gefion
Danish Centre for AI Innovation
operationalCopenhagen
Denmark
Not disclosed1,528 H100—C draft · Source →Map ↗
MareNostrum 5
Barcelona Supercomputing Center
operationalBarcelona
Spain
Not disclosed4,480 H100—B draft · Source →Map ↗
LUMI
CSC – IT Center for Science
operationalKajaani
Finland
Not disclosed11,912 MI250X—B draft · Source →Map ↗
Nebius Lappeenranta
Nebius
announcedLappeenranta
Finland
310MWNot disclosed2027C draft · Source →Map ↗
Nebius Mäntsälä
Nebius
operationalMäntsälä
Finland
75MWNot disclosed—C draft · Source →Map ↗
Fluidstack France 1GW AI supercomputer
Fluidstack
cancelledSite not disclosed
France
1GWNot disclosed—C draft · Source →—
Mistral Compute — Bruyères-le-Châtel
Mistral AI · dev. Eclairion
under constructionBruyères-le-Châtel
France
44 MW13,800 GB300—C draft · Source →Map ↗
CoreWeave Crawley
CoreWeave
operationalCrawley
United Kingdom
Not disclosedNot disclosed—C draft · Source →Map ↗
CoreWeave Lanarkshire AI Growth Zone (DataVita)
CoreWeave · dev. DataVita
announcedNorth Lanarkshire
United Kingdom
Not disclosedNot disclosed—B draft · Source →Map ↗
CoreWeave London Docklands
CoreWeave
operationalLondon
United Kingdom
Not disclosedNot disclosed—C draft · Source →Map ↗
Google Waltham Cross
Google
operationalWaltham Cross
United Kingdom
Not disclosedNot disclosed—B draft · Source →Map ↗
Isambard-AI
University of Bristol
operationalBristol
United Kingdom
5MW5,448 GH200—B draft · Source →Map ↗
Nebius at Ark Longcross Park
Nebius · dev. Ark Data Centres
operationalLongcross
United Kingdom
16MW4,000 HGX B300—C draft · Source →Map ↗
Nebius at Kao Data Harlow
Nebius · dev. Kao Data
announcedHarlow
United Kingdom
22MWNot disclosed—D draft · Source →Map ↗
Nscale Loughton AI Campus
Nscale
announcedLoughton
United Kingdom
50MW, scalable to 90MW23,040 GB300Q1 2027B draft · Source →Map ↗
QTS Cambois Data Centre Campus
QTS
permittedCambois
United Kingdom
Not disclosedNot disclosed—B draft · Source →Map ↗
Stargate UK — Cobalt Park
Nscale · dev. OpenAI
pausedNorth Tyneside
United Kingdom
Not disclosedNot disclosed—C draft · Source →Map ↗
Leonardo
CINECA
operationalBologna
Italy
Not disclosed13,824 A100—B draft · Source →Map ↗
Start Campus SIN01
Start Campus
operationalSines
Portugal
Not disclosed12,600 GB300—C draft · Source →Map ↗
Start Campus SIN02
Start Campus
under constructionSines
Portugal
Not disclosed66,000 RubinQ4 2027C draft · Source →Map ↗
Mistral AI × EcoDataCenter Borlänge
Mistral AI · dev. EcoDataCenter
announcedBorlänge
Sweden
Not disclosedNot disclosed2027B draft · Source →Map ↗

Not mapped: Fluidstack France 1GW AI supercomputer — location never confirmed by the parties.

Status is the latest disclosed status; later press reports are noted on each record page and do not change status until a primary source confirms them. Download: facilities.geojson.